The second shaft log has been sleeved. Dr Doug has been busy on the port engine freeing up the frozen engine mounts and aligning the shaft, strut and engine.
The shaft packing gland has been taken apart and acid bathed, cleaned, repacked and replaced. New hose and stainless clamps - double clamped of course.
No comments:
Post a Comment